- 01
On every gauge
Projected spend by the reset, or the time until the fuse blows.
- 02
No noise
Hidden until 5% of the period (and at least 30 minutes) has passed.
- 03
On the overview
The project list flags projects on pace to blow before their reset.
Know when the ceiling will be hit, before it is
A meter at 40% on the 10th is fine. A meter at 40% on the 2nd isn't. The forecast tells them apart.